06 Mar 2017
Instalación de Pista Atlética

We present this new installation project of an athletic track in the terrace of a building in the city of Quito, more than 230 M2 of synthetic rubber track.

03 Oct 2016
Proyecto Puente Margarita-Chone

Personal

Metros

Días

WORK DIAGNOSIS

New Road Project in the City of Chone, we have a concrete structure, and without any board, new bridge.

SOLUTION

Carry out the installation of JCV-400 CAUCHOS VIKINGO, in direct installation.

Working time: 5 days

BENEFIT

The joints offered by CAKE VIKING are made with NEOPRENE; Allowing large-scale movements between two parts of the structure; Is resistant to extreme environmental conditions and are designed for heavy traffic, in addition to helping to keep the asphalt layer in good condition, avoiding deterioration due to conditions already mentioned.

The Builder benefits by purchasing high quality Ecuadorian products with international competitiveness, which prevents them from importing and helps to reduce costs.

HUMAN TALENT

The personnel required for this work consists of the following list of highly qualified personnel:

Work supervisor: 1

Work Assistants: 4

Total staff required: 5 people

09 Jul 2016

Personal

Metros

Días

WORK DIAGNOSIS

New Road Project in the City of Guayaquil, we have a concrete structure with spaces ready for installation.

SOLUTION

Carry out the installation of JCV-400 joints of CAUCHOS VIKINGO, in direct installation.

Working time: 6  días

BENEFIT

The joints offered by CAUCHOS VIKINGO are made with NEOPRENE; Allowing large-scale movements between two parts of the structure; Is resistant to extreme environmental conditions and are designed for heavy traffic, in addition to helping to keep the asphalt layer in good condition, avoiding deterioration due to conditions already mentioned.

The Builder benefits by purchasing high quality Ecuadorian products with international competitiveness, which prevents them from importing and helps to reduce costs.

HUMAN TALENT

The personnel required for this work consists of the following list of highly qualified personnel:

Work supervisor: 1

Work Assistants: 3

Total staff required: 4 people

11 Jun 2016
Instalación de juntas en Puente Nobol

Personal

Metros

Días

WORK DIAGNOSIS

Proyecto Vial en Nobol en la provincia del Guayas, disponemos de una carpeta asfáltica de 9 cm, y sin ninguna junta.

SOLUTION

Perform the installation of joints JCV-250 of CAUCHOS VIKINGO, direct installation.

Working time: 6  días

BENEFIT

The joints offered by CAUCHOS VIKINGO are made with steel; Allowing large-scale movements between two parts of the structure; Is resistant to extreme environmental conditions and are designed for heavy traffic, in addition to helping to keep the asphalt layer in good condition, avoiding deterioration due to conditions already mentioned.

The Builder benefits by purchasing high quality Ecuadorian products with international competitiveness, which prevents them from importing and helps to reduce costs.

TALENTO HUMANO

The personnel required for this work consists of the following list of highly qualified personnel:

Work supervisor: 1

Work Assistants: 3

Total staff required: 4 people

11 May 2016
Instalacion de junta en autopista rumiñahui

Personal

Metros

Días

WORK DIAGNOSIS

Road Project in the Rumiñahui Expressway in the city of Quito, we have an asphalt folder in good condition, and without any board, new bridge.

SOLUTION

Carry out the installation of JCV-250 joints of CAUCHOS VIKINGO, with direct installation.

Working time: 3 days

BENEFIT

The joints offered by CAUCHOS VIKINGO are made with Neoprene; Allowing large-scale movements between two parts of the structure; Is resistant to extreme environmental conditions and are designed for heavy traffic, in addition to helping to keep the asphalt layer in good condition, avoiding deterioration due to conditions already mentioned.

The Builder benefits by purchasing high quality Ecuadorian products with international competitiveness, which prevents them from importing and helps to reduce costs.

HUMAN TALENT

The personnel required for this work consists of the following list of highly qualified personnel:

Work supervisor: 1

Work Assistants: 3

Total staff required: 4 people