Instalación de juntas en Puente Nobol

The Details

Personal

Metros

Días

WORK DIAGNOSIS

Proyecto Vial en Nobol en la provincia del Guayas, disponemos de una carpeta asfáltica de 9 cm, y sin ninguna junta.

SOLUTION

Perform the installation of joints JCV-250 of CAUCHOS VIKINGO, direct installation.

Working time: 6  días

BENEFIT

The joints offered by CAUCHOS VIKINGO are made with steel; Allowing large-scale movements between two parts of the structure; Is resistant to extreme environmental conditions and are designed for heavy traffic, in addition to helping to keep the asphalt layer in good condition, avoiding deterioration due to conditions already mentioned.

The Builder benefits by purchasing high quality Ecuadorian products with international competitiveness, which prevents them from importing and helps to reduce costs.

TALENTO HUMANO

The personnel required for this work consists of the following list of highly qualified personnel:

Work supervisor: 1

Work Assistants: 3

Total staff required: 4 people