Instalación de juntas en puente nuevo de la panamericana

The Details

Personal

Metros

Días

WORK DIAGNOSIS

New Road Project in the City of Cuenca, we have an asphaltic folder of 12 cm, and without any joint.

SOLUTION

Carry out the installation of JCV-250 joints of CAUCHOS VIKINGO, with direct installation..

Working time: 3 days

BENEFIT

The joints offered by CAUCHOS VIKINGO are made with Neoprene; Allowing large-scale movements between two parts of the structure; Is resistant to extreme environmental conditions and are designed for heavy traffic, in addition to helping to keep the asphalt layer in good condition, avoiding deterioration due to conditions already mentioned.

The Builder benefits by purchasing high quality Ecuadorian products with international competitiveness, which prevents them from importing and helps to reduce costs.

HUMAN TALENT

The personnel required for this work consists of the following list of highly qualified personnel:

Work supervisor: 1

Work Assistants: 4

Total staff required: 5 people