The Details
Personal
Metros
Días
WORK DIAGNOSIS
Bridge located in the sector of the Lumbisi interchange, it is only with an asphaltic folder of 10 cm of thickness.
It is required the provision and installation of expansion joints.
SOLUTION
Perform the installation process of Expansion Joints, CAKE VIKING. Installing joints JCV-300 for approximately 80 meters linear, which included installation with grout mortar.
BENEFIT
The joints offered by CAUCHOS VIKINGO are made with Neoprene; Allowing large-scale movements between two parts of the structure; Is resistant to extreme environmental conditions and are designed for heavy traffic, in addition to helping to keep the asphalt layer in good condition, avoiding deterioration due to conditions already mentioned.
The Builder benefits by purchasing high quality Ecuadorian products with international competitiveness, which prevents them from importing and helps to reduce costs.
HUMAN TALENT
The personnel required for this work consists of the following list of highly qualified personnel:
Work supervisor: 1
Work Assistants: 5
Total staff required: 6 people