Instalacion de juntas en el puente paso superior 1

The Details

Personal

Metros

Días

WORK DIAGNOSIS

Bridge located in the sector of the Auquitas interchange, is only with an asphaltic folder of 12cm of thickness.

The provision and installation of expansion joints with highly qualified personnel is required.

SOLUTION

Perform the installation process of Expansion Joints, CAKE VIKING. Installing JCV-300 seals for approximately 80 meters linear, in which installation with elastomeric transition mortar was included.

BENEFIT

The joints offered by CAUCHOS VIKINGO are made with Neoprene; Allowing large-scale movements between two parts of the structure; Is resistant to extreme environmental conditions and are designed for heavy traffic, in addition to helping to keep the asphalt layer in good condition, avoiding deterioration due to conditions already mentioned.

The Builder benefits by purchasing high quality Ecuadorian products with international competitiveness, which prevents them from importing and helps to reduce costs.

HUMAN TALENT

The personnel required for this work consists of the following list of highly qualified personnel:

Work supervisor: 5

Work Assistants: 13

Total staff required: 18 people

About The Project