Obra en Paso lateral de Tachina

The Details

Personal

Metros

Días

WORK DIAGNOSIS

Bridge located to the side of Tachina in Esmeraldas, is only with an asphalt folder

It is required the provision and installation of expansion joints.

SOLUTION

Perform the installation process of Expansion Joints, CAKE VIKING. Installing JCV-200 seals for approximately 30 meters linear, which included direct installation.

 

BENEFIT

The joints offered by CAUCHOS VIKINGO are made with Neoprene; Allowing large-scale movements between two parts of the structure; Is resistant to extreme environmental conditions and are designed for heavy traffic, in addition to helping to keep the asphalt layer in good condition, avoiding deterioration due to conditions already mentioned.

The Builder benefits by purchasing high quality Ecuadorian products with international competitiveness, which prevents them from importing and helps to reduce costs.

HUMAN TALENT

The personnel required for this work consists of the following list of highly qualified personnel:

Work supervisor: 3

Work Assistants: 5

Total staff required: 8 people

About The Project